How Long Does it Take to Replace Hardwood Floors?

Have you ever thought about how long does it take to install Hardwood Floor? Figuring out how long it takes to install hardwood flooring is a good thing to pursue. No one wants to wait around for weeks on end to walk around their house, deal with the dust and people coming through, the noise, on top of the process preventing you from making any plans. There is also no firm answer on how long it takes to replace hardwood floors.

That may not be the thing you want to read but, think about it. There are many factors to consider beyond the professionalism of the contractors you hire. What's the state of the underfloor, have you moved your furniture, how many rooms are being replaced, to name a few examples. Let's go over how best to figure out the timetable to replace your hardwood floors before you get started on the process. Hardwood floor installation takes a few days and a lot of patience.

Time Table to Replace Hardwood Flooring

To better understand the average time it takes to replace hardwood floors, it's good to know what goes into it. Here are some basic steps that go into getting new wood floors put in your home:

Removing the Old hardwood floor

This is a bit of a no-brainer. Can't put in a new hardwood floor unless the old one has been removed. Since this isn't about how long it takes to install hardwood floors yourself, let's move on.

Acclimation

This is essentially making sure the moisture of the hardwood flooring matches the environment it's being handled in. This step is important so that the replacement hardwood floors aren't a total nightmare to deal with. You'll probably see the contractor bring out the new flooring and lay it crosswise and leave them exposed to the air so they can "breathe". This isn't a process to be rushed and you may find it frustrating because you're looking at the new hardwood floor while the work is still going on. It's tempting to think "what's taking so long! It's right there!" Well, now you know why.

Preparing Subflooring

Part of the time it takes to replace hardwood floors is dealing with the subflooring. The floor you see is not the only floor you have. Anything that could interfere with the new flooring, or any damage to the subflooring, must be dealt with before they can lay down the new floors. It's an important process that you do not want to rush, a mishap here could lead to replacing your hardwood floors much sooner.

Installing floor wood

The step you've been waiting for. For hardwood flooring installation service, it can take 1-3 days depending on the size of the room or rooms the team is working on. Typically, 2 contractors can install 750-1000 square feet a day.

The overall timetable to replace hardwood flooring is around 10 days, depending on the size of your project. The majority of the work is ripping out the old floorings and checking the subflooring. It's only at the end do your replacement floors go in. Be patient, it's worth the wait for it to be done right.

When to Replace Installed Hardwood Floors

Before refinishing your hardwood floors for the umpteenth time, the hardwood floors will tell you when it's time to replace them. Here are some signs it's time to replace hardwood floors:

  • Water Damage: If the floor is warped, you have to replace them.
  • Numerous Refinishing: There is only so much refinishing can do to save your floors. If it's something you're doing more than every few years, it's time for a new floor.
  • Excessive Damage: if your floors are warping, the boards shifting around like it's on water, and large gashes or water stains, refinishing won't do the trick. You need a new floor.

If you're unsure if it's time to replace the hardwood flooring or if they can be saved, ask a trusted contractor for an assessment. Either way, it's income for them.

Helping to Replace Hardwood Floors Timely

There are some things you can do to speed up the process of installing new flooring. Things that contractors aren't responsible for and that means they can get to work without any obstructions creating a longer timetable.

You can:

  • Get all the furniture and decorative pieces out of the room
  • Make sure you have access to where you need to go that doesn't impede work, like the kitchen.
  • Note the days for installing flooring and plan around them.

These simple measures can really help the timetable for replacing hardwood flooring to continue without interruption. Make sure the contractors can do what you've hired them to, that your life isn't too disruptive with proper planning, and then enjoy your hardwood floors.

Related Questions:

  • How long does it take to install 1000 sq ft of a hardwood floor?

    The time taken to install a 1000 sq ft of hardwood floor is usually 1 to 3 days for a two-person crew. However, the time taken to complete the job depends on the number of people working and their efficiency to work. If you want the work to finish early, it would be best to hire a bigger number of people.

  • How long does it take to install wood floors in one room?

    Time taken to install wood floors in a room or in the entire house depends on the area of the floor that needs to be worked on. On average, two people can do 750 to 1000 sq feet of flooring each day. If the room is between that size, it is possible to floor a room in one day.

  • How long does it take to install 1500 square feet of hardwood floors?

    The duration of time required to install 1500 square feet of hardwood flooring depends on the number of people employed to do the work. A two-man team can floor anywhere from 750-1000 sq feet in a day. Considering this, flooring 1500 sq feet might need a couple of days.

  • How much does it cost to install 1000 square feet of hardwood floors?

    Installing 1000 sq feet of hardwood flooring would require about $7000-$12000.

Tags: